Bottled Water Production Line
Production line planning, equipment selection and sourcing for bottled and sachet water production, covering water treatment, bottle blowing, filling, capping and labelling. Rolangear prepares a project-specific equipment configuration and technical proposal.
What you can produce
- Bottled drinking water
- Sachet water
- Large-format water containers
Production process
Source Water Intake
Source water is drawn and tested to establish the treatment required.
Water Treatment
Filtration, reverse osmosis and disinfection bring the water to potable standard.
Treated Water Storage
Treated water is held in storage tanks ahead of filling.
Bottle Blowing
Where bottles are produced in-house, PET preforms are blown into finished bottles.
Rinsing, Filling and Capping
Bottles are rinsed, filled and capped, normally on a combined monoblock.
Labelling and Packing
Labels are applied and bottles are shrink wrapped and packed.
How Rolangear delivers this line
Production line planning
We plan the line around your finished product, target output and available factory space.
Equipment selection
We specify the machinery each stage of the process requires.
Sourcing & integration
We source the equipment and integrate it into a single working line.
Technical proposal
You receive a written technical proposal covering configuration and scope.
Factory requirements
Related machinery
Guides for this production line
Factory study
All studies →Frequently asked questions
Engineering and after-sales support
Installation & Commissioning
Engineer-supported installation and commissioning of the supplied equipment at your factory.
Operator Training
Training for your operators and maintenance staff on the equipment supplied.
Spare Parts
Spare parts supply for the machinery in your production line.
After-Sales Support
Technical support after handover, including remote assistance.
The scope of engineering, installation and after-sales support is confirmed per project in the technical proposal. More about Rolangear services.